Located in Río Negro province, over Gral. San Martín gas pipeline, this plant was modified in order to increase reliability and transport capacity of Gral. San Martín gas pipeline.

Remodeling and expansion Works took 6000 hours of engineering and covered approximately 70 % of Plant surface.

The Project consisted of changing the Plant existing pipe lines: gas pipes for suction and discharge, vent gas, consumption gas, gas pipeline interconnection, water and oil pipelines; changing the three existing compressors, replacement of the three dust-collection units, addition of three oil air-coolers, two new vent chimneys and a new gas pipeline and plant operation control system.

Moreover, all the civil work necessary for pipes and equipment support, instrumentation for plant’s suction and discharge control, by pass and stop and engines, pumps, boards and lighting electric power service provision.