Unilever Pond´s Plant is located in Civac city – Cuernavaca – México.

COINTEC did a full survey of the electric facilities of the plant, in electric substation nº 1, service and production area, as regards board disposition, strength distribution (tray and main conduits path) and unifilar diagrams.

COINTEC has also updated UNILEVER’s documentation with the information obtained from the surveys and with respect to changes done during plant shutdown.

COINTEC used these blueprints as a base for the second stage of the surveys, location of the missing boards, determination of conductor section and paths up to each section board in each area.