Tag Archive: TOTAL AUSTRAL


Cañadon Alfa and Rio Cullen Plants and Production Deposits Off-Shore and On-Shore are located in Cuenca Austral (Austral Basin) which is in Isla Grande de Tierra del Fuego (Great Island of Tierra del Fuego).

COINTEC has participated intensively on the development of new exploiting areas ALFA SOUTH, CULLEN SOUTH, CULLEN NORTH and ARGO Project.

The projects we refer to in which COINTEC has participated are:

 

 

WORKS ON CUENCA AUSTRAL (AUSTRAL BASIN) FOR TOTAL AUSTRAL

 

DESCRIPCION LONGITUD UBICACIÓN REFERENCIA
Gaspipeline 10’’ 6.5 Km Manifold Alfa South − Battery 4 1
Gaspipeline 8’’ 8.0 Km Manifold Alfa South − Battery 2 2
 Gaspipeline 8’’ 2.0 Km Troncal − Battery 4 3
Gaspipeline 3’’ 4.0 Km Troncal − Manifold Alfa South 4
Oil pipeline 8’’ 5.0 Km Manif. Cullen South−Cullen Plant 5
Gaspipeline 4’’ 5.0 Km Manif. Cullen South−Cullen Plant 6
Aqueduct 6’’ 5.0 Km Manif. Cullen South−Cullen Plant 7
Gaspipeline 12’’ 6.0 Km Manifold Alfa South − Battery 4 8
Gaspipeline 12’’ 8.0 Km Cañadón Alfa − Battery 4 9
Gaspipeline 12’’ 7.0 Km Manif. Cullen North−Manif. Alfa South 10
Gaspipeline 3’’ 3.0 Km Troncal − Manifold Cullen North 11
Gaspipeline 10’’ 27.0 Km Cullen Plant − Cañadón Alfa Plant 12
Propane pipeline 6’’ 3.0 Km Cañadón Alfa Plant − Border 13
Gaspipeline 10’’ 7.0 Km Manif. Cullen North − Manifold Alfa South 14
Gaspipeline 12’’ 6.0 Km Manifold Alfa South − Battery 4 15
Warehouse and manifold for high performance wells  Alfa South 16
Expansion Battery 4 for Gas pipeline reception 17
Increase in Pumping Capacity Battery 2 18
Increase in Pumping Capacity Battery 1 19
Hydra Centro Platform reaching of Oil pipeline 8’’, Gas pipeline 3’’ for inyection gas and command lines for wells of Argo Underground Basin 20
Underground Operation Manifold for Oil pipelines and Gas pipelines Argo Underground Basin 21
Warehouse and manifold for high Performance wells Cullen South 22
Pig−Receivers Area in Cullen Plant 23
Warehouse and manifold for High Performance Wells Cullen North 24
Modification Gamela Verde Río Cullen Deposit 25
Mechanical and Detail Civil Engineering Revision Cañadon Alfa Deposit − Debottlenecking 26
Extension of effluent treatment of OIL WATER Río Cullen Plant 27
Drinking Water Network Cañadon Alfa 28
Anuncios

En la Cuenca Austral contenida en la Isla Grande de Tierra del Fuego, se encuentran las Plantas de Cañadón Alfa y Río Cullen y los Yacimientos de Producción Off-Shore y On-Shore. 

 

COINTEC ha participado intensivamente en el desarrollo de las nuevas áreas de explotación ALFA SUR, CULLEN SUR, CULLEN NORTE y el Proyecto ARGO.

Los proyectos a los que hacemos referencia en los cuales COINTEC ha participado son:         

                                                                                                                                                                                                                                                             TRABAJOS EN LA CUENCA AUSTRAL PARA TOTAL AUSTRAL

 

DESCRIPCION LONGITUD UBICACIÓN REFERENCIA
Gasoducto 10’’ 6.5 Km Manifold Alfa Sud − Batería 4 1
Gasoducto 8’’ 8.0 Km Manifold Alfa Sud − Batería 2 2
Gasoducto 8’’ 2.0 Km Troncal − Batería 4 3
Gasoducto 3’’ 4.0 Km Troncal − Manifold Alfa Sud 4
Oleoducto 8’’ 5.0 Km Manif. Cullen Sud−Planta Cullen 5
Gasoducto 4’’ 5.0 Km Manif. Cullen Sud−Planta Cullen 6
Acueducto 6’’ 5.0 Km Manif. Cullen Sud−Planta Cullen 7
Gasoducto 12’’ 6.0 Km Manifold Alfa Sud − Batería 4 8
Gasoducto 12’’ 8.0 Km Cañadón Alfa − Batería 4 9
Gasoducto 12’’ 7.0 Km Manif. Cullen Norte−Manif. Alfa Sud 10
Gasoducto 3’’ 3.0 Km Troncal − Manifold Cullen Norte 11
Gasoducto 10’’ 27.0 Km Planta Cullen − Planta Cañadón Alfa 12
Propanoducto 6’’ 3.0 Km Planta Cañadón Alfa − Frontera 13
Gasoducto 10’’ 7.0 Km Manif. Cullen Norte − Manifold Alfa Sud 14
Gasoducto 12’’ 6.0 Km Manifold Alfa Sud − Batería 4 15
Bodega y manifold para pozos de alta performance Alfa Sud 16
Ampliación Batería 4 para recepción de gasoductos 17
Aumento de Capacidad de Bombeo Batería 2 18
Aumento de Capacidad de Bombeo Batería 1 19
Plataforma Hydra Centro llegadas de Oleoducto 8’’, Gasoducto 3’’ para gas de inyección y líneas de comando para pozos de Cuenca Submarina Argo 20
Manifold submarinos de operación para Oleoductos y Gasoductos CuencaSubmarina Argo 21
Bodega y manifold para pozos de alta performance Cullen Sur 22
Área de Pig−Receivers en Planta Cullen 23
Bodega y manifold para pozos de alta performance Cullen Norte 24
Modificación Gamela Verde Yacimiento Río Cullen 25
Revisión de la Ingeniería Mecánica y Civil de Detalle Yacimiento CañadónAlfa − Debottlenecking 26
Extensión del tratamiento de efluentes de OIL WATER Planta Río Cullen 27
Red de Agua Potable Cañadon Alfa 28

 

 

 

 

 

 

 

EXTRACTION, TREATMENT AND TRANSPORTATION OF GAS AND OIL

 

TOTAL AUSTRAL, the Argentine subsidiary of the French company, is the second most important natural gas producer in the country and one of the most important oil producers.

In the continental area, they develop their activities in Aguada San Roque Plant and Aguada Pichana Plant with their associated deposits, and El Huemul Deposit.

COINTEC has been selected by TOTAL AUSTRAL as an external collaborator for the development of their modification and expansion projects, having completed many engineering services in the development of continental deposits.

 

Some of the projects are:

 

  • Deposit El Huemul PMF12 – Fiscal Measurement point 12

Development of Basic and Detail Engineering for Measurement and Gas delivering System for TGS in GSM Gas Pipeline Pico Truncado compressor station.

 

  • Aguada Pichana Project.

Design of Protections for Operation crossroads over existing gas pipelines.

 

  • San Roque Development Project.

Survey for Implantation

Project and Bidding conditions preparation for the construction of L.T. 33 kV and Feeding Power Transformer Station.

Project and Bidding conditions preparation for the construction of services of water, sewage, telephony and basic infrastructure.

 

  • San Roque Development Project.

Revision of Bidding Documents of the Debottlenecking.

 

  • Loma de la Lata Gas Pipeline – Gas Metering Unit.

Topographic Surveys.

Soil Studies.

Resistivity Measurement

Implantation Study.

Soil Movement and Drainages Blueprints.

Technical specifications.

 

  • Loma de la Lata – UAM 2.

Multidisciplinary Detail Engineering for Measurement Unit Installation and related services.

 

  • Aguada San Roque – PLOT PLAN.

Survey of Existing Facilities and creation of a Plot Plan according to Installation.

 

  • Aguada San Roque – PSV –  LLY PLANT.

Survey and Detail Engineering for the modification of 70 PSV valves existing in plant.

 

 

 

 

 

 

 

 

EXTRACCION, TRATAMIENTO Y TRANSPORTE DE GAS Y PETROLEO

TOTAL AUSTRAL, filial de la empresa francesa en la Argentina, es la segunda productora de gas natural del país y una de las más importantes productoras de petróleo.

En la zona continental, su actividad se desarrolla fundamentalmente en la Planta de Aguada San Roque y la Planta Aguada Pichana con sus yacimientos asociados, y el Yacimiento El Huemul.

COINTEC ha sido seleccionado por TOTAL AUSTRAL como colaboradora externa para el desarrollo de sus proyectos de modificación y ampliación, habiendo prestado numerosos servicios de ingeniería en el desarrollo de los yacimientos continentales.

Algunos de estos proyectos son:

 

 

  • Yacimiento El Huemul PMF12 – Punto de Medición Fiscal 12.

Desarrollo de Ingeniería básica y de detalle para el sistema de Medición y entrega de Gas a TGS en el Gasoducto GSM estación compresora Pico Truncado.

 

  • Aguada Pichana Project.

Diseño de protecciones para cruces de caminos de operación sobre gasoductos existentes.

  • San Roque Development Project.

Relevamiento para Implantación.

Elaboración de proyecto y pliego para la construcción de L.T. 33 kV y Estación Transformadora de Alimentación.

Elaboración de proyecto y pliego para la construcción de los servicios de agua, desagües cloacales, telefonía e infraestructura básica.

  • San Roque Development Project.

Revisión de Pliegos Licitatorios del Debottlenecking.

  • Gasoducto Loma de la Lata – Unidad de Gas Metering.

Relevamientos Topográficos.

Estudios de suelos.

Medición de Resistividad.

Estudio de Implantación.

Planos de movimientos de Suelos y Drenajes.

Especificaciones Técnicas

  • Loma de la Lata – UAM 2.

Ingeniería de detalle multidisciplinaria para la instalación de la unidad de medición y servicios conexos.

  • Aguada San Roque – PLOT PLAN.

Relevamiento de las instalaciones existentes y confección de Plot Plan conforme a instalación.

  • Aguada San Roque – PSV – PLANTA LLY.

Relevamiento e Ingeniería de Detalle para la modificación de 70 válvulas PSV existentes en planta.