COMBINED CYCLE POWER PLANT
DOCK SUD S.A.
RIVER COOLING WATER INTAKE N° 1 y 3
Adequacy
During 1999 Dock Sud S.A. built a new Combined Cycle Power Plant in Dock Sud – Avellaneda – Buenos Aires Province.
Due to the necessity of cooling water, the old intake channels Nº 1 and 3, which link the “Riachuelo” with the new pump house, were adapted.
COINTEC participated in the civil preliminary Project for the adequacy of the underground collection channels by checking and modifying the existing reinforced concrete structures and piling and, at the same time, planning new distribution channels and inspection wells.
SAN LORENZO HARBOUR
ESSO S.A.P.A.
Given the Risk Assessment Conditions defined by ESSO Company internationally, the redesigning of San Lorenzo Plant’s services was necessary.
COINTEC participated in this Project performing the following tasks in San Lorenzo’s Harbour:
- Dock and Mooring Dolphins Topographic Survey
- Bathymetry for the installation of water intakes for the fire fighting system.
- Design of water intake for plant supply system.
- Fire fighting system revamping.